GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest

Agency: AGRICULTURE, DEPARTMENT OF
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159188595559184
Posted Date: Jan 12, 2023
Due Date: Feb 28, 2023
Solicitation No: 1240LT23R0002
Source: https://sam.gov/opp/509d33bf53...
Follow
GAOA Redfish Lake Phase 3 Improvements Sawtooth National Forest
Active
Contract Opportunity
Notice ID
1240LT23R0002
Related Notice
1240LT23R0002
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
USDA-FS, CSA INTERMOUNTAIN 8
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • All Dates/Times are: (UTC-07:00) MOUNTAIN STANDARD TIME, DENVER, USA
  • Original Published Date: Jan 12, 2023 03:02 pm MST
  • Original Date Offers Due: Feb 28, 2023 04:30 pm MST
  • Inactive Policy: Manual
  • Original Inactive Date: Apr 30, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z2PA - REPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING)
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Stanley , ID
    USA
Description

Solicitation Posting



Presolicitation Notice



GAOA Redfish Lake Phase 3 Improvements



Sawtooth National Forest



DESCRIPTION OF WORK



Project Description:



Furnish all labor, equipment and materials necessary to accomplish the work under this contract. This project will reconstruct existing paved/gravel roads, parking lots, and trails along Forest Road #214 within the Redfish Lake Recreation Complex. Work will occur at three primary locations as follows:




  1. Entrance Area




  • ~2,150 lineal feet of new asphalt roadway from State Highway 75 to the Phase 1 project limits including a slight re-route to accommodate construction of a new 18-vehicle gravel Entrance Station parking lot and ~600 lineal feet of new gravel trail.




  1. Roundabout Area


    • ~250 lineal feet of new asphalt roadway pullout including signing, striping, and barrier rock relocation.

    • Remove three existing destination signs at the roundabout intersection for Forest Roads #214 and #214A and replace with six new destination signs having larger font, symbols, and more concise verbiage.



  2. North Shore Area

    • ~3,110 lineal feet of new asphalt roadway from the Phase 1 project limits to the entrance of the Glacier View Campground including a re-route away from the lakeshore to accommodate construction of a new 28-vehicle paved Visitor Center parking lot and access roadway, and a new 44-vehicle paved North Shore parking lot and access roadway.

    • ~1,775 lineal feet of new asphalt trail along the lakeshore (former FS Road #214 and service road/trail), including construction of a new underlying distribution waterline and various services.

    • Reconstruct the North Shore Day Use Area including site amenities.

    • Remove/Rehab/Recontour the existing Visitor Center / North Shore parking lots, a former paved service road, and various former road cut/fill sections to render these areas returned to their pre-developed state.





Construction includes, but is not limited to, construction survey and staking, clearing and grubbing, extensive earthwork including excavation & embankment, rock/boulder removal, installation of drainage facilities consisting of culverts and roadside ditches, installation of new waterline piping, service connections, and other appurtenances, minor sanitary sewer manhole adjustments, signing, striping, existing asphalt and underlying aggregate base pulverizing, new asphalt road/parking/trail construction, and construction of other miscellaneous improvements as required.



Project Location:



From Stanley, Idaho proceed south approximately four (4) miles on Idaho State Highway #75 to the junction with Forest Road #214. This represents the point of beginning of the Entrance Area. From there proceed approximately 0.40 miles along the existing Forest Road #214 to the Chinook Bay Campground exit approach which marks the point of ending of the Entrance Area. From there, proceed approximately 1.20 miles along the existing Forest Road #214 to the Redfish Phase 1 limits which marks the point of beginning of the North Shore Area. From there, proceed approximately 0.60 miles along the existing Forest Road #214 to the Glacier View Campground entrance which marks the point of ending of the North Shore Area.



Contract Time:



The work anticipated under any contract resulting from this solicitation anticipated start date for administrative and construction preparation tasks- June 5, 2023



August 14, 2023 – anticipated start date for on-the-ground construction.



The Project End Date will be October 31, 2024



The magnitude of proposed project is between $1,000,000 and $5,000,000.


Attachments/Links
Contact Information
Contracting Office Address
  • 324 25th ST
  • Ogden , UT 844012310
  • USA
Primary Point of Contact
Secondary Point of Contact


History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >